**The due date for this solicitation has passed**
CM/GC Service for Sheriff’s Office Northeast Substation Phase II Construction
Solicitation #
24-075
Status:
Awarded
Type:
RFP
Department:
Sheriff
Open Date:
12/04/2024
Due Date:
02/05/2025
2:00 PM MST
2:00 PM MST
Award Date:
04/08/2025
Award:
Awarded to Buildings by design for $8,215,460
RFP-24-075; SHERIFFS OFFICE NORTHEAST SUBSTATION - PHASE II CONSTRUCTIONAttachments
1. Substation Construction Documents
Notice of Intent to Award_RFP-24-075
RFP-24-075 Submittal Log
Final Award Notice_RFP-24-075
RFP-24-075 Consolidated MatrixAddendum 1
RFP-24-075 Addendum No. 1
1. Complete Substation Construction Documents
2. Summary
3. Testing and Inspection
4. Temporary Facilities and Controls
5. Construction Waste Management and Disposal
6. CommissioningAddendum 2
RFP-24-075 Addendum 2Addendum 3
RFP-24-075 Addendum No. 3
7. EPCO Falcon Sub-Station - Specifications, Volume 1
8. EPCO Falcon Sub-Station - Specifications, Volume 2
9. Updated Complete Substation Construction Documents (revised 2)Addendum 4
RFP-24-075 Addendum No. 4
RFP-24-075 Contractor Sign-in
10. Revised Pricing Form
11. Revised Construction Documents
12. Revised Specifications
13. RMG Soils Report
14. Stormwater Management Plan (SWMP)Addendum 5
RFP-24-075 Addendum No. 5Addendum 6
RFP-24-075 Addendum No. 6
15. Revised Construction Documents 01.27.2025
16. Revised Specifications 01.27.2025
17. Composite Rainscreen Technical Data Packet
18. Facilities Background Check Form< Back to Solicitations